In October 2021, the Trinidad Express reported that WASA, the Water and Sewerage Authority, had announced a temporary shutdown of the Point Lisas desalination plant. The cause was emergency work on a raw water pipeline 42 inches in diameter. Operator Desalination Company of Trinidad and Tobago ramped production down and stopped it at 6 p.m. WASA usually received 40 million gallons a day (about 182,000 m³/d) from the plant. Several thousand residents in central, southern and south-western Trinidad faced a weekend without piped water, and no repair timeframe was given.
The report showed how heavily supply in large parts of Trinidad depended on a single desalination plant. Damage to one feed line was enough to leave whole districts relying on water trucks and calls to save water.
Source: Trinidad Express

