In December 2015, Water. Desalination + reuse (Faversham House) reported that Israeli planners had rejected a pipeline proposed by Mekorot for the Red-Dead project, days after prequalification opened. Jordan and Israel had tendered the US$900 million scheme as a build, operate, transfer contract. At its core was a seawater desalination plant in Aqaba with about 178,000 m³/d (65,000 Ml a year), later about 233,000 m³/d. Brine was to reach the Dead Sea via a 180 km line on Jordanian territory costing US$400 million. An appeal was expected.
The report showed that a cross-border scheme backed by both governments still depended on national planning procedures, and that environmental concerns about the Dead Sea and the Jordan River remained open.

