In September 2018, TradeArabia reported, based on a statement by Pöyry, that the Finland-based consulting and engineering firm had been hired by the Saline Water Conversion Corporation (SWCC) as owner's engineer for Phase 3 of the Shuqaiq water transmission system. Pöyry was to review contractors' engineering and supervise construction, erection and commissioning. Three packages covered pipelines to Majardah, Abha and Samta plus eight pumping stations. From the Red Sea desalination plant, water had to climb more than 2,000 metres and pass through tunnels, 650,000 m³/day in total with Phase 4.
The report showed that for large Red Sea plants even the pipeline into the highlands was a demanding project in its own right, for which the client hired separate engineering oversight.
Source: TradeArabia (Kopie im Webarchiv)