EN|DE

Category: Salt Whispers

  • Kenya, 2019: Solar-powered desalination for 1,000 families in Mtongwe

    Kenya, 2019: Solar-powered desalination for 1,000 families in Mtongwe

    In December 2019, The Star in Kenya reported on a solar-powered desalination plant in Mtongwe on the Indian Ocean. It was set up by the Bilal Muslim Mission of Kenya, funded by the Irene and Friedrich Vorwerk Foundation and Boreal Light GmbH. Pumping in seawater, the unit treated 2,000 litres an hour, or up to 20 m³/day. It was meant to serve 1,000 families and supply drip irrigation to demonstration farms. The mission put the cost at about KSh 9 million.

    The report showed how small solar-powered units run by charities were filling supply gaps on the Kenyan coast, while larger municipal desalination projects in Mombasa had not yet started.

    Source: The Star

  • Spain, 2019: Microbial desalination demo opens in Denia

    Spain, 2019: Microbial desalination demo opens in Denia

    In December 2019, Water. Desalination + reuse (Faversham House) reported, citing the MIDES consortium, that it had opened its first demonstration site at Aqualia's Racons plant for brackish water in Denia. The process used microbial desalination cells, in which bacteria break down organic matter in wastewater and the resulting electricity helps remove salt. The aim was 150 litres of drinking water per hour at under 0.5 kWh/m³. The Horizon 2020 group of ten organisations from seven countries had worked on scale-up since 2016 and planned two more sites.

    The report showed research in 2019 aiming to pair desalination with wastewater treatment to cut energy use. At 150 litres per hour, the scale was still that of a demonstration unit.

    Source: Water. Desalination + reuse (Faversham House)

  • Mallorca, 2019: Three municipalities call for a desalination plant

    Mallorca, 2019: Three municipalities call for a desalination plant

    In November 2019, Euro Weekly News reported that the Mallorcan municipalities of Santanyí, Campos and Ses Salines were jointly calling for a new desalination plant. Santanyí mayor Maria Pons put the request to Joana Maria Garau, Director General of Water Resources at the Ministry of Environment. The goal was better drinking water for Santanyí, where quality was described as poor. The council also pressed for a faster link to the island network via Sa Marineta and planned an interim pipeline to Es Llombards.

    The report showed how smaller island municipalities sought to secure drinking water both through a local desalination plant and through connection to a regional pipeline network.

    Source: Euro Weekly News

  • El Segundo, 2019: West Basin certifies desalination EIR

    El Segundo, 2019: West Basin certifies desalination EIR

    In November 2019, the board of the West Basin Municipal Water District voted 4 to 1 to certify the Final Environmental Impact Report (EIR) for an ocean water desalination plant on the coast just north of Manhattan Beach's border with El Segundo. The report covered a local project of 20 million gallons (about 75,700 m³) per day, while a regional plant of up to 60 million gallons remained possible. It was no decision to build: cost estimates and a cost-benefit analysis were still pending. LA Waterkeeper announced a lawsuit.

    The report showed the typical conflict over seawater desalination in California: water security and climate resilience on one side, energy use, emissions and cheaper alternatives such as water recycling on the other.

    Source: Easy Reader & Peninsula

  • Durban, 2019: Environmental authorisation for desalination near oThongathi

    Durban, 2019: Environmental authorisation for desalination near oThongathi

    In November 2019, The Mercury reported that the Department of Environmental Affairs had issued an environmental authorisation for a proposed desalination plant in northern eThekwini near oThongathi and invited public comment. Applicant Umgeni Water stressed that it had no plans at present to build in either the north or the south of the metro. Spokesperson Shami Harichunder pointed to the Lower Thukela and Lower uMkhomazi supply schemes. In 2016, a plant north of Durban had been estimated at 5 billion rand.

    The report showed that Umgeni Water kept desalination open as an authorised option while relying on conventional bulk water schemes for the coming years.

    Source: The Mercury (Kopie im Webarchiv)

  • California, 2019: Water district reviews slant wells for Doheny

    California, 2019: Water district reviews slant wells for Doheny

    In November 2019, the Laguna Beach Independent reported that the South Coast Water District board had asked on 14 November for an explanation of the drilling method for the planned Doheny desalination project. Brian Villalobos of GEOSCIENCE Support Services recommended slant wells off Doheny State Beach, where test wells had run for 18 months. The plant was to supply 35,000 residents and 1,000 businesses as well as two million annual visitors. Vice President Dennis Erdman called for firm purchase commitments from neighbouring agencies.

    The report showed that, besides the intake technology, the key open question at Doheny was which agencies in south Orange County would buy the desalinated water.

    Source: Laguna Beach Independent (Kopie im Webarchiv)

  • Gold Coast, 2019: Tugun desalination plant ramped up to full capacity

    Gold Coast, 2019: Tugun desalination plant ramped up to full capacity

    In November 2019, ABC News reported that Seqwater had ordered a sharp increase in output at the desalination plant in Tugun, Gold Coast, after combined dam levels in South East Queensland fell to 60 per cent, the lowest in 11 years. Since 2013, the plant had supplied only 10 to 20 million litres every two weeks. According to Seqwater manager Mike Foster, at full capacity it would produce 133 million litres and meet roughly 15 per cent of regional drinking water demand.

    The report showed how the Tugun plant was ramped up as a reserve when dam levels fell; water restrictions were only planned once storage dropped to 50 per cent.

    Source: ABC News

  • Karachi, 2019: PTI announces desalination plant near Sea View

    Karachi, 2019: PTI announces desalination plant near Sea View

    In November 2019, Samaa Digital reported that lawmakers of the PTI party had announced a seawater desalination plant near Sea View in Karachi. It was intended to provide drinking water to residents of the Defence and Clifton areas. According to MNA Aftab Siddiqui, the cost would exceed 7 billion rupees, and work was to begin in two months. At the same event, PTI politician Khurram Sher Zaman accused the Sindh provincial government of delaying development projects.

    The report showed that desalination in Karachi had become a subject of political announcements; at the time only the intention was documented, with no contract or financing.

    Source: Samaa Digital (Kopie im Webarchiv)

  • Trinidad, 2019: Leak shuts down Point Lisas desalination plant

    Trinidad, 2019: Leak shuts down Point Lisas desalination plant

    In November 2019, the Trinidad Express reported an unplanned shutdown of the Point Lisas desalination plant in Trinidad. According to a notice from the Water and Sewerage Authority (WASA), a leak in the plant's fiberglass clearwell system required emergency repairs. Owner and operator Desalcott was assessing the damage. The plant supplied WASA with 40 million gallons of water a day for the Point Lisas Industrial Estate and communities in Central and South Trinidad. WASA increased output at its Caroni and Navet plants and deployed truck-borne water.

    The report showed how heavily supply to a whole region depended on a single desalination plant: one leaking component was enough to affect industry and households at the same time.

    Source: Trinidad Express

  • Chile, 2019: ACCIONA to power Atacama desalination plant with renewables

    Chile, 2019: ACCIONA to power Atacama desalination plant with renewables

    In October 2019, ACCIONA announced that state-owned water company ECONSSA Chile had awarded it the electricity supply for its seawater desalination plant in Caldera in the Atacama region. The long-term power purchase agreement (PPA) was to start in November 2019 and cover the plant's entire demand with wind and solar power. ECONSSA had been building the plant since early 2018; in three stages it was to grow from about 38,900 m³/d to about 103,700 m³/d and serve four municipalities. It was ACCIONA's sixth such deal in Chile.

    The report showed that in Chile even a state-owned desalination plant aimed to meet its power demand through a long-term renewable energy contract and thereby lower operating costs.

    Source: ACCIONA (Pressemitteilung)

Part of the PIM Group · independent since 2002 · a hidden champion in water, energy and resources.

Salzgeflüster - our monthly desalination newsletter. Independent, no advertising. Subscribe free.